Half-light

Knocked-down drywall half-sidelight units

Installation video

Features

  • Unlimited prep and reinforcement options
  • Any hinge locations
  • Factory primer per ANSI A250.10
  • Installed with compression anchors and your choice of base anchors

Construction options

  • Opening width, height and jamb depth to your specification
  • Most drywall profiles
  • 16 or 14 gauge cold rolled, galvannealed, G90 galvanized, and stainless steel

Lead time options

  • Standard: 8 to 10 business days¹
  • Express: 1 to 7 business days²
  • Turbo: ships the same day you order

¹ Consult factory for options on larger projects, 25-day standard lead time for stainless
² Lead time based on available capacity at time of order

Don’t see what you need here?  Check out our elevations, KD drywall systems, or specialty frames!

HMF EXPRESS