Hospital stops

Documents

This frame is great for allowing floors to be cleaned with ease; there are no stops at the floor to trap debris.

Features

Construction options

  • Variable height and choice of 45º or 90º angle at bottom of stop
  • Opening width, height and jamb depth to your specification
  • All masonry or drywall profiles, or send us your custom profile
  • Various anchor options
  • 16, 14, or 12 gauge cold rolled, galvannealed, G90 galvanized, and stainless steel
  • Knocked-down:
    • KD drywall
    • KD for field assembly
    • KD for customer to weld
  • Factory welded:
    • Face welded
    • Continuously welded
  • Lead lined, radius, angled, and many other specialty frame options

Certifications

Lead Time Options

  • Standard: 8 to 10 business days¹
  • Express: 1 to 7 business days²

¹ Consult factory for options on larger projects, 25-day standard lead time for stainless
² Lead time based on available capacity at time of order

Don’t see what you need here?  Check out our elevations, KD drywall systems, or specialty frames!

 

HMF EXPRESS